Location: Onshore & Offshore, Vietnam
Commence: Jul2012
Duration: 1year with extension option
Criteria:-
- Prepare pre-commissioning schedule to catch up project schedule and base on it to push construction team follow it
- Verify and check construction work when receiving mechanical completion checksheets from construction
- Make Discipline Acceptance Certificate package, handover to client and chase up them sign off it
- Do and complete the pre-commissioning checksheet
- Check and review the drawing, comment if any mistake
- Mobilize vendors to do SAT to do pre-commissioning if required and control their work to minimize payment
- Do redline markup drawing after pre-commissioning
- Issue RFC after completing pre-comm the system
- Support commissioning work