04 January 2010

Completion Engineer

Position: Completion Engineer
Location: Vungtau, Vietnam
Commence: Feb2010
Criteria:-
  • 2 development wells.
  • Start April2010
  • Water depth +87m MSL
  • Wellhead Height +24m
  • Jack up type.
  • BHT 148 degree C
  • BHP 5,877 psi
  • pipesim nodal for all wells.
  • Incorporate files into pipenet
  • create full gas system model for RD/RDT production platform
  • completions design for 2 development wells.
  • Define wellbore deliverability form all well
  • well testing operations (design and well testing offshore management)
  • perforating strategy for each well (bottoms up, specific intervals, or all intervals at one time).
  • Design rigless, slickline, perforating and cleanup operations after drilling operations are completed.
  • Design PLT operations after drilling operations are completed.
  • Analysis of PLT data and flow allocation.