Location: Brunei
Commence: Sep2009
Duration: 23months
Criteria:-
- develop Level 2/3 Project Plan
- allow all critical path activities identified and mitigated early.
- develop plan, progress reports and S-curves in P3E and develop link with SAP for cost reporting.
- incorporate procurement plans and drilling schedules in project plans.
- conduct regular QC, realism and do-ability check
- establish new and maintain existing Planning best practices
- Degree in Engineering or Quantity Surveying or Diploma in Planning
- Qualified Planning Engineer, with good multi- discipline engineering knowledge.
- 8-10years O&G Engineering Projects.
- worked in Design, Procurement, Construction and Commissioning.
- Plan the Resources, Activities and Interfaces effectively,
- working to Project costs and Schedules.
- Expert use of Planning Tools, Methods, Soft ware, e.g., MS Project, Primavera P3e, Network Development, Critical Path Analysis, Trend Analysis, Schedule Crushing, Recovery Plans etc.
- Eager to acquire knowledge on Projects Probabilistic Risk Analysis concept & approach.
- Training on Pertmaster.