25 June 2009

JackUp Drilling Rig Services

Services: JackUp Drilling Rig Services
Location: Terengganu, Malaysia
Commence: Oct2009
Duration: 45days
Criteria:-
  • Infill Drilling Program
  • 1 well
  • 300’ Water depth and above
  • Two (2) or three (3) Mud Pumps
  • 5” or 5-1/2” Drill Pipe
  • Mud system - 1900bbls Drilling Mud, 1500bbls Brine
  • Solids Control - 4 shakers, Centrifuge preferred
  • Storage Material - FuelOil 2400bbls, Cement 3600cu/ft, Barite 4000cu/ft, Bentonite 1400cu/ft, BaseOil 1000bbls, DrillWater 5000bbls
  • BOP/Diverter – Min 13-5/8” 5,000 psi
  • Variable Decl Load (Drilling) > 5,000 kips
  • Top Drive – TDS3 and above (Drilling Torque – min 35K ft/lbs)