Location: Terengganu, Malaysia
Commence: Oct2009
Duration: 45days
Criteria:-
- Infill Drilling Program
- 1 well
- 300’ Water depth and above
- Two (2) or three (3) Mud Pumps
- 5” or 5-1/2” Drill Pipe
- Mud system - 1900bbls Drilling Mud, 1500bbls Brine
- Solids Control - 4 shakers, Centrifuge preferred
- Storage Material - FuelOil 2400bbls, Cement 3600cu/ft, Barite 4000cu/ft, Bentonite 1400cu/ft, BaseOil 1000bbls, DrillWater 5000bbls
- BOP/Diverter – Min 13-5/8” 5,000 psi
- Variable Decl Load (Drilling) > 5,000 kips
- Top Drive – TDS3 and above (Drilling Torque – min 35K ft/lbs)