01 March 2009

Integrated Slickline Services

Services: Integrated Slickline Services
Location: Yetagun, Myanmar
Commence: Jul2009
Duration: 14 development/infill wells
Criteria:-
  • production logging
  • tag bottom / held-up depth
  • drift run prior to electricline / wireline / coiledtubing logging
  • RIH pressure gauge for static bottom hole pressure survey and pressure build-up survey
  • Corrosion evaluation and monitoring
  • Sand detection
  • Data processing, quality assessment and analysis
  • Perforation
  • Through tubing subsurface safety valve setting
  • Through tubing backpressure and two-way check valves setting
  • Any other through tubing related operations capable of being conducted by slickline